Woh Hup (Private) Limited
Bukit Timah
86+ years in business
7 min walk from Beauty World MRT
- BCA registered
Businesses with the most complete public records first, photos, licence matches, hours and track record. Never ordered by payment.

Bukit Timah
86+ years in business
7 min walk from Beauty World MRT

Novena
24+ years in business
12 min walk from Novena MRT

Clementi
23+ years in business
16 min walk from Jurong East MRT

Ang Mo Kio
29+ years in business
9 min walk from Lentor MRT

Clementi
39+ years in business
16 min walk from Bukit Batok MRT

Hougang
30+ years in business
14 min walk from Kovan MRT

Clementi
20+ years in business
16 min walk from Jurong East MRT

Boon Lay
21+ years in business
25 Tanjong Kling Rd

Sungei Kadut
39+ years in business
24 min walk from Kranji MRT

Jurong West
50+ years in business
15 min walk from Pioneer MRT

Sungei Kadut
35+ years in business
20 min walk from Yew Tee MRT

Woodlands
35+ years in business
14 min walk from Admiralty MRT
Ordered by verifiable signals, licence matches, track record and completeness of public records. Featured placements are labelled and never change this order.
Show all 395Location, MRT walk, years in business, licence and published hours, facts from public records.
| Business | Area | MRT | In business | Licence |
|---|---|---|---|---|
| Woh Hup (Private) Limited | Bukit Timah | 7 min · Beauty World | 86 yrs | BCA registered |
| Unimax Creative | Novena | 12 min · Novena | 24 yrs | BCA registered |
| K.W. Const & Engrg Pte Ltd | Clementi | 16 min · Jurong East | 23 yrs | BCA registered |
| Prelim Construction Pte Ltd | Ang Mo Kio | 9 min · Lentor | 29 yrs | BCA registered |
| Shaft Build Construction Pte Ltd | Clementi | 16 min · Bukit Batok | 39 yrs | BCA registered |
| Hydro-Seal Engineering | Hougang | 14 min · Kovan | 30 yrs | BCA registered |
| Innovez Engineering Pte Ltd | Clementi | 16 min · Jurong East | 20 yrs | BCA registered |
| Jurong Engineering Limited | Boon Lay | – | 21 yrs | BCA registered |
Expected 2025 HDB renovation costs from Qanvast, based on 259 BTO and 302 resale projects. Resale flats cost more because of hacking, rewiring and replumbing. Hidden works can push costs up significantly.
3-room BTO
S$36,100–S$43,700 per flat
Fewer than 30 data points; indicative
4-room BTO
S$51,000–S$61,800 per flat
5-room BTO
S$67,000–S$82,400 per flat
3-room resale
S$51,000–S$61,800 per flat
Full reconfiguration can cost much more
4-room resale
S$64,300–S$80,300 per flat
5-room resale
S$84,300–S$97,000 per flat
Hacking and disposal of floor tiles
S$3–S$8 per sq ft
Requires an HDB permit; screeding extra
Sources: Qanvast: How much is a 3, 4 and 5-room HDB renovation in 2025? (15 Jan 2025); SmartCalculator.sg: Flooring cost Singapore (2026). Prices in SGD, before GST unless stated.
Directory of Renovation Contractors (DRC)
Housing & Development Board (HDB) · Required by law
Under the Housing & Development (Renovation Control) Rules, HDB flat owners must only engage contractors listed in the DRC for renovation works. DRC contractors apply for HDB permits on your behalf and can be given demerit points or debarred for breaches.
Check the official registerCaseTrust accreditation for renovation businesses
Consumers Association of Singapore (CASE) · Optional accreditation
Voluntary. Accredited firms cap the initial deposit at 20% of contract value, buy a deposit performance bond, use the CaseTrust Standard Renovation Contract and give at least a 12-month workmanship warranty. A joint CaseTrust–RCMA scheme exists for RCMA members.
Check the official registerBCA Approved Window Contractor
Building and Construction Authority (BCA) · Required by law
Window installation or replacement must be done by a BCA-approved window contractor (registered under workhead RW01) using trained window installers. For HDB flats the firm must also be listed with HDB.
Check the official registerQanvast's 2025 figures put a 3-room BTO at about $36,100–$43,700, a 4-room BTO at $51,000–$61,800 and a 5-room BTO at $67,000–$82,400. Resale flats cost more: about $64,300–$80,300 for a 4-room and $84,300–$97,000 for a 5-room, because of hacking, rewiring and replumbing. Budget a contingency for hidden works.
Some works need HDB approval and others do not. Hacking or removing walls, replacing or raising floor finishes, window replacement and changes to sanitary piping all need approval, which your DRC contractor applies for. Simple works such as painting, carpentry and installing lights or fans generally do not. Check HDB's renovation guidelines for your specific works.
It is HDB's list of contractors allowed to carry out renovation works in HDB flats. Under the Housing & Development (Renovation Control) Rules, flat owners must only engage DRC-listed contractors. HDB can fine errant contractors, give demerit points and debar those who exceed the threshold, and unauthorised works must be reinstated at the owner's and contractor's cost.
Owners of new BTO flats are generally required to wait three years before removing wall or floor finishes in toilets, to avoid damaging the original waterproofing. Tiling over existing tiles is an alternative some owners use. Any toilet works that affect floor finishes or piping still require a permit, so confirm the current rule with HDB or your DRC contractor.
CaseTrust-accredited renovation businesses cap your initial deposit at 20% of the total cost and protect it with a deposit performance bond if the firm closes or is wound up. They must use the CaseTrust Standard Renovation Contract, collect payments by milestones, give at least a 12-month workmanship warranty and go through CASE mediation for disputes.
Lookup lists 395 renovation contractors in Singapore as of October 2026, with the largest concentration in Geylang (39). Listings are compiled from government registers and open map data and refreshed regularly.